Structure
• Earth Quake Resistant RCC framed structure.
Treatment
• Anti-termite treatment during various stages of construction
Wall finish
Internal
• Plaster, Putty and Primer
• Ceiling white OBD
External
• Weather coat/ texture paint.
Flooring
• Vitrified tiles in foyer, Living, Dinning and Bed rooms.
• Ceramic tiles utility areas and Balcony.
Toilet
Walls
• Ceramic tiles upto Lintel Height.
Flooring
• Anti-skid ceramic floor tiles.
Fittings
• Hot & Cold Water supply (without geyser) with
CP fittings of premium make.
Sanitaryware
• Pastel / White colour Vitreous Ceramic sanitaryware of premium make.
Wash Basin
• Wash basin in all toilets and granite counter in Master toilet.
Wet Zone
• Dry & wet zone in all toilets.
Plumbing
• PPR / CPVC concealed plumbing.
Kitchen
• Modular under cabinet with Granite top and stainless steel sink.
Wall
• 2 feet designers ceramic tiles dado above working platform.
Flooring
• Ceramic tiles.
Fittings
• Water supply with CP fittings of premium make.
Appliances Provision
• Provision of electrical point for chimney, microwave and water purifier shall be provided.
Windows
• Aluminium anodised/ Powder Coated windows with glass shutters.
Doors
Main Door
• European Style Polished Moulded door with necessary hardware locks.
Internal Doors
• European Style Moulded door shutters painted in two coats of synthetic enamel paint.
• Internal Bedroom Doors shall have necessary hardware and lock.
Power Backup
• Adequate Power backup for common area services including lift in each building.
Electrical
• Adequate light points & power points in all rooms, toilets & kitchen.
• Copper wiring of reputed brand in concealed PVC conduits.
• Branded Modular switches for light & power points.
• TV points in all bedrooms & living.
• Provision for split AC in Master Bed Room, living rooms and window AC in rest of Bed rooms.
• Distribution board with MCB's of reputed make.
• Provision for intercom in living room.